Question No: 61 – (Topic 2)

Which one of these choices consists of a task or tasks included in the system migration service component of the implement phase?

  1. Define Requirements for Monitoring Service Level Measurements

  2. Confirm Project milestones and cutover Roles and Responsibilities

  3. Determine Project schedule, Develop Resource Plan, Establish Project Budget

  4. Assess implementation readiness at each site, define timelines for Post-Implementation Testing, Execute Contingency Plans as required

  5. Verify that escalation path is in place for difficulties with test cases

Answer: D

Question No: 62 – (Topic 2)

Which three of these tasks go into developing a migration strategy? (Choose three.)

  1. Review Low Level Design with Emphasis on Order of Implementation Activities

  2. Review Migration Plan and Implementation schedule

  3. Identify Core infrastructure implementation Requirements and Timeline

  4. Verify High level site-specific installation Requirements

  5. Develop Test Plan, Test Cases and Execution Methodology

  6. Define Failure Recovery Procedure and Risk Mitigation Strategy

Answer: A,C,F

Question No: 63 – (Topic 2)

Which templates, tools or reference materials are used in the Business case development service component of the prepare phase? (Choose two.)

  1. Value Assessment Worksheet

  2. ROI required information checklist

  3. Financial justification case study

  4. Preliminary Discovery Document-Gap Analysis

  5. Income Statement

  6. Statement of change in financial Position

Answer: B,C

Question No: 64 – (Topic 2)

Which of these is a deliverable to the customer in the implement phase?

  1. WLAN operations Assessment Report

  2. An Executed WLAN migration plan

  3. Security Vulnerability and Recommendations Report

  4. WLAN Location-based Service Assessment Report

  5. Technology Assessment Report

  6. WLAN Operations Readiness Assessment Report

Answer: B

Question No: 65 – (Topic 2)

During the System acceptance testing, which template is used to capture the network elements to be tested and the tests that will be completed after solution implementation?

  1. Technical Requirements Document

  2. High Level Design

  3. Bridge Traffic Analyzer

  4. IPCC Enterprise Configuration Checklist

  5. Network Ready For Use

Answer: E

Question No: 66 – (Topic 2)

In the design phase, which tasks is conducted during the creating of a site specific network implementation plan activity?

  1. Finalize calls flows and Route Plans

  2. Create Installation, Commission and Network connectivity Test Tasks and Checklist

  3. Review Customer Remediation Responsibilities

  4. Determine shipping Dates and Logistics

Answer: B

Question No: 67 – (Topic 2)

Which service component within the prepare phase helps to increase the chances that the proposed system will meet the customer requirements and expectations?

  1. WLAN Wire Network Integration Assessment

  2. Business Requirements Development

  3. Technology Strategy Development

  4. High Level Design Development

  5. Proof Of Concepts

  6. Business Case Development

Answer: E

Question No: 68 – (Topic 2)

Which of these is a key deliverable in the design phase?

  1. As-Built Solution Binder, Operations Support Plan Report, Change Management Status Report

  2. Business Requirements Document, Preliminary Discovery Document, Technology Requirements Document, Financial Analysis and Business Case

  3. Low Level Design, Staging Plan, Operations Plan, Migration Plan

  4. WLAN Site Readiness Assessment Report, voice over WLAN Assessment Report, Operations Readiness Assessment Report

  5. Escalation Plan, Communication Plan, Staff Training Plan

Answer: C

Question No: 69 – (Topic 2)

Which of these service components are part of the plan phase?

  1. WLAN Tuning assessment

  2. WLAN site readiness assessment (RF survey)

  3. Voice Over WLAN assessment

  4. Migration plan development

  5. WLAN location-based services assessment

  6. WLAN performance and troubleshooting assessment

Answer: B,C,E

Question No: 70 – (Topic 2)

In plan phase, which tow tasks are associated with the conduct operational assessment activity? ( Choose two.)

  1. Obtain and review operational procedures and policies

  2. Document plan to remediate operational issues

  3. Document systems, Processes, flow-through, tools, people, skill and best practices

  4. Identify operations personnel and stakeholders for interviews

  5. Conduct Operations personnel and stakeholders interviews

Answer: C,E

100% Free Download!
Download Free Demo:650-621 Demo PDF
100% Pass Guaranteed!
Download 2017 Dumps4cert 650-621 Full Exam PDF and VCE

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 Dumps4cert IT Certification PDF and VCE