Lifecycle Services for Advanced Wireless LAN (LCSAWLAN)

Question No: 51 – (Topic 1)

The activity of identifying the customer#39;s support model for WLAN is part of Operations Readiness Assessment, which phase the statement related to?

  1. the prepare phase

  2. the plan phase

  3. the design phase

  4. the operate phase

Answer: B

Question No: 52 – (Topic 1)

Which of the following service components are not performed during the wireless implement phase? Select two?

  1. Project planning

  2. Site Readiness Specification

  3. Configuration Management

  4. Systems Acceptance Testing

Answer: B,C

Question No: 53 – (Topic 1)

Within which phase does the WLAN service component assess the customer’s

business and technical requirements and includes a solution value assessment?

  1. the prepare phase

  2. the design phase

  3. the operate phase

  4. the plan phase

Answer: A

Question No: 54 – (Topic 1)

Which of the following activities is not a part of the wireless technology strategy development service component in the prepare phase?

  1. Make Preliminary Technical Discovery

  2. Form Migration Strategy

  3. Hold Technology Strategy Meeting

  4. Develop WLAN Technology Strategy

Answer: B

Question No: 55 – (Topic 1)

Which of the following service components are related to the design phase? Select all that apply.

  1. System requirements Validation

  2. Staging Plan Development

  3. Migration Plan Development

  4. Detailed Design Customer signoff

Answer: B,C,D

Question No: 56 – (Topic 1)

Choose one activity that are not part of the WLAN site readiness assessment (RF Survey) service component in the plan phase.

  1. Perform Site Gap Analysis

  2. Hold Kickoff Meeting

  3. Conduct Customer Site Survey(s)

  4. Develop Site Requirements Specification Report

Answer: B

Question No: 57 – (Topic 1)

Which of the following wireless service components is not included in the operate phase?

  1. Operations Assessment

  2. Incident Management

  3. Security Administration

  4. System monitoring

Answer: A

Question No: 58 – (Topic 1)

Which of the following service components are not included in the WLAN optimize phase? (Select one)

  1. Operations Assessment

  2. Technology Assessment

  3. Incident Management

  4. Security Assessment

Answer: C

Topic 2, Practice

Question No: 59 – (Topic 2)

The preliminary discovery document is created by the preliminary technical discovery activity as part of the technology strategy development service component. Which three tasks in the preliminary technical discovery activity focus on the preliminary discovery document? (Choose three.)

  1. Conduct Solution Value Assessment

  2. Document Existing Topology, Hardware and software

  3. Document Logical Level Functionality Requirements

  4. Document Departmental Business Initiatives Requirements

  5. Identify Wireless Technologies To address Business and technical requirements

  6. Analyze Customer Technical and Operational Requirements for system

Answer: B,E,F

Question No: 60 – (Topic 2)

In the design phase, which template or tool is used to complete the schedule station reviews with user group task?

  1. Low Level Design

  2. Operational Assessment Checklist

  3. Bill of Materials

  4. As Built Documentation

  5. Business Requirements Document

Answer: E

100% Free Download!
Download Free Demo:650-621 Demo PDF
100% Pass Guaranteed!
Download 2017 Dumps4cert 650-621 Full Exam PDF and VCE

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 Dumps4cert IT Certification PDF and VCE